BLACK FRIDAY STARTS NOW! · Shop Now
Call Sales & Quotes 800-919-6548

Robertson AV Guides

How to Request an AV Equipment Quote That Gets Approved

By Robertson AV ·

Illustration of an itemized AV equipment quote document with an approved check mark

In short: an AV equipment quote gets approved quickly when the request behind it is complete. Send the rooms, quantities, an equipment list or RFP if you have one, your deadline and your delivery conditions. Then check the quote against your approver’s checklist before you route it. If you’re ready now, request a quote and a specialist will reply with an itemized formal quote, typically within one business day.

Most quotes that stall in approval weren’t priced wrong. They were priced on half the information. The room was described but the quantity wasn’t, the mount was missing, the delivery address turned out to be a loading dock with no liftgate, or the quote didn’t show what finance needed to see. Each gap costs a revision cycle, and revision cycles push a summer install into September.

This guide covers what to put in a quote request, how to describe a project when you don’t have a model list yet, and what to check on the quote before you send it up the chain.

What makes an AV quote “approvable”?

Approvers rarely judge the equipment. They check whether the paperwork answers their questions without a follow-up email. In most organizations that means:

  • Itemized lines. Each product, quantity and unit price on its own line, not one bundled “classroom package” figure.
  • A clear pricing window. Approvers want to know how long the price holds. Ask your RobertsonAV specialist how long the quoted pricing holds, and note it with the quote. RobertsonAV holds quoted pricing so the invoice matches the paperwork.
  • The right buyer and ship-to details. The legal organization name, billing contact and every delivery address.
  • Freight and tax handled up front. No surprise lines after the PO is issued (see the shipping and tax sections below).
  • A scope that matches the request. If the board approved “12 classrooms”, the quote should show 12 rooms’ worth of equipment, including mounts and cabling.

A quote that covers those points can be attached to a requisition, a board item or a funding file as-is.

What should you include in an AV equipment quote request?

Checklist of what to include in an AV quote request: rooms, quantities, equipment list or RFP, timeline, delivery details and buyer details

1. The rooms, not just the products

Describe each space: room type (classroom, huddle room, boardroom, gym, sanctuary), approximate dimensions, ceiling height and what the room is used for. Room data is what lets a specialist check throw distance, display size and audio coverage. RobertsonAV validates compatibility, coverage and throw distances before it prices, so the quote is buildable.

If you’re comparing projection and flat panels, our classroom display planning guide and projector lumens guide by room size help you describe the room in the terms a specialist will use.

2. Quantities per room and in total

Give both. “Twenty rooms, one display each, two in the library” prices faster and more accurately than “about 22 displays”. Totals matter for volume pricing too: RobertsonAV offers multi-unit and project-based pricing, and it can only be applied to a quantity that’s on the request.

3. Your equipment list or RFP, if you have one

If your integrator or consultant already wrote a list, upload it. The quote form accepts an equipment list or RFP as a PDF, Excel, CSV, Word or image file up to 8 MB. Include model numbers where you have them. If a model on your list is a poor fit for the room, a specialist will flag it before pricing rather than after delivery.

A typical classroom or meeting-room line list might look like this:

Line Example item What to state on the request
Display or projector Epson PowerLite L630SU short-throw laser projector or LG 65UR340C9UD 65″ commercial TV Room size, screen size, daily hours of use
Mounting Chief WM210AUS short-throw projector wall arm Wall or ceiling type, mounting height
Rack or cabinet Atlas WMA12-23 12RU wall cabinet Rack units needed, equipment depth
Cables and accessories Per room Cable run lengths, connector types

These are examples of how to describe lines, not recommendations for your rooms. Browse projectors, televisions and monitors and mounts if you want to name models yourself.

4. No list? Describe the problem instead

You don’t need a spec to ask for a quote. “Eight classrooms, about 30 by 25 feet, students can’t read the board from the back row, install in July” is a workable request. On the /business/ page, RobertsonAV says you can send an equipment list “or just the rooms you need to outfit”. A specialist turns that into an itemized line list.

5. Your timeline and the real deadline

The quote form asks for a project timeline (as soon as possible, 2–4 weeks, 1–3 months, 3–6 months, or planning/budgeting only). Pick the one that fits, then add the dates that actually constrain you in the notes: board meeting, fiscal year-end, install window, building access. For schools, RobertsonAV coordinates staged shipments and delivery windows with summer installs and semester breaks, and it can only plan around dates it has been given.

If you’re only budgeting, say so. A budgeting quote and a buy-now quote can contain the same lines, but the budgeting one should note that pricing has to be re-confirmed when funds are released.

6. Delivery conditions

Shipping is free on all RobertsonAV orders within the United States, including oversized and heavy items. Large-format displays and other heavy items ship by freight, and freight deliveries are typically curbside. If your site needs liftgate service or inside delivery, mention it on the quote request. Also list loading-dock hours, a site contact and, for multi-site projects, every ship-to address.

7. Buyer details and organization type

Use the legal name of your organization and pick the right organization type (Corporate, Government, Education, House of Worship, Healthcare or Other). If you’ll pay by purchase order, say so on the request.

How do you describe a multi-site or phased project?

Split it the way you’ll receive and pay for it. If building A installs in June and building B in August, ask for the quote by site or phase, with separate ship-to addresses and dates. That gives your approver a clean total, and it gives receiving staff a packing list that matches what arrives. RobertsonAV supports staged shipments and multi-site rollout logistics, so say which lines ship where and when.

What should you check on the quote before routing it?

Flow from quote request to spec check, formal quote, internal review and approval

Before you attach the quote to a requisition, read it the way your approver will:

  1. Line count and quantities match your room list.
  2. Accessories are there: mounts, brackets, cabinets, cables. Missing accessories are a common reason for a second PO.
  3. Pricing window covers your approval timeline. Ask how long the quoted pricing holds, and put the board meeting date on the request so it’s known from the start.
  4. Ship-to and bill-to are correct and complete.
  5. Delivery notes include any liftgate, inside delivery or dock requirements you asked for.
  6. Tax status is right for where the order ships (next section).

If something is off, reply on the same quote rather than starting a new request. That way all your paperwork references a single quote.

How are sales tax and payment handled?

Sales tax. RobertsonAV doesn’t charge sales tax on orders shipped outside Florida. Florida orders are taxed unless the buyer submits a valid tax-exemption certificate. In Florida, governmental entities such as school districts and qualifying nonprofits obtain a Consumer’s Certificate of Exemption (Form DR-14) from the Florida Department of Revenue. If your order ships to Florida and you’re exempt, log in to your RobertsonAV account and submit your exemption certificate there before you place the order.

Payment. You can pay by card, PayPal, or a purchase order against the formal quote. Net terms are available for eligible partners. To ask whether your organization qualifies, mention it on your quote request. The PO process is covered step by step in Buying AV Equipment With a Purchase Order.

Vendor paperwork. If your purchasing office needs a W-9 or other vendor documentation before it can issue a PO, ask for it with the quote. Both are available on request.

Common reasons AV quotes get sent back

  • “Package” pricing with no line items. Ask for itemized lines.
  • Quantities that don’t match the approved scope. Count rooms, not boxes.
  • Missing mounts or infrastructure. The display was approved and the bracket wasn’t.
  • Lapsed pricing by the time the board met.
  • Delivery surprises: a liftgate need or dock restriction discovered on delivery day.
  • Wrong legal entity on the quote, so the PO can’t reference it.

A complete request fixes all six before they happen.

Ready to request a quote?

Send your rooms, quantities and timeline, plus an equipment list or RFP if you have one, through the RobertsonAV quote request. A specialist reviews every request and replies with an itemized formal quote, typically within one business day. Education buyers can also see how RobertsonAV works with K-12 districts and campuses. Prefer to talk? Call 800-919-6548 or email orders@robertsonav.com.

FAQ

What information do I need to request an AV equipment quote?
At minimum: the rooms (type and approximate size), quantities, your timeline and the delivery address. An equipment list or RFP helps but isn’t required. You can describe the problem and a specialist will build the line list.

How long does it take to get a formal AV quote from RobertsonAV?
A specialist reviews every request and replies with pricing, typically within one business day.

Can I upload an RFP or equipment list with my quote request?
Yes. The quote form accepts an equipment list or RFP as a PDF, Excel, CSV, Word or image file up to 8 MB.

How long is a RobertsonAV quote valid?
Ask your RobertsonAV specialist when you request the quote. Quoted pricing is held so your invoice matches your paperwork.

Is shipping included in the quote?
Shipping is free on all RobertsonAV orders within the United States, including oversized and heavy items. Large-format displays ship by freight on a pallet, typically curbside. If your site needs liftgate service or inside delivery, mention it on the quote request.

← All AV guides